<img height="1" width="1" src="https://www.facebook.com/tr?id=3990718177617800&amp;ev=PageView &amp;noscript=1">

Roco Rescue

Roco Rescue
RescueTalk™ provides leading news and information for safety and rescue professionals and is a service of Roco Rescue, Inc., who specializes in confined space rope rescue training and rescue products for first responders in industrial rescue, municipal rescue and military rescue.
Find me on:

Recent Posts

Rescue Challenge 2015 off to a great start

Wednesday, October 7, 2015

2015 CHALLENGE PHOTO GALLERY

A big Louisiana welcome to the six industrial rescue teams participating in this year's Challenge. Here are the "before" shots. Good luck and good learning!

Rescue Challenge 2015 off to a great startRescue Team Calumet – Superior, WI


Rescue Challenge 2015 off to a great startRescue Team Exxon Plastics – Baton Rouge, LA


Rescue Challenge 2015 off to a great startRescue Team Lion Oil – El Dorado, AR


Rescue Challenge 2015 off to a great startRescue Team Shell-Geismar – Geismar, LA


Rescue Challenge 2015 off to a great startRescue Team Valero – Wilmington, CA


Rescue Challenge 2015 off to a great startRescue Team Motiva-Convent – Convent, LA


Rescue Challenge 2015 off to a great startChallenge Evaluators with Kay Goodwyn, Roco’s president

left to right: Jason Stubbs, Kenny Greene, Randy Crews, Jim Breen, Kenney Moore, Kay Goodwyn, Dominic Velasquez, Terrell Huber, Mike Adams, Randy Miller, Homero Garcia, Dwaynne Ardeneaux, Eddie Chapa, Chad Roberson, Troy Gardner, Bobby Kauer, Dennis O’Connell

Here's the photo gallery

Rescue Team Calumet – Superior, WI Rescue Challenge 2015 off to a great start Rescue Challenge 2015 off to a great start Rescue Challenge 2015 off to a great start
Rescue Challenge 2015 off to a great start Rescue Challenge 2015 off to a great start Rescue Challenge 2015 off to a great start Rescue Challenge 2015 off to a great start
Rescue Challenge 2015 off to a great start Rescue Challenge 2015 off to a great start Rescue Challenge 2015 off to a great start Rescue Challenge 2015 off to a great start
Next

Annual Equipment Inspections for Rescue Teams

Monday, September 14, 2015

Roco is now offering an on-site inspection service for rescue gear used by emergency response teams. Save time and manpower by having our rescue professionals perform your annual equipment inspections.

Benefits include:

    • • Certified personnel to inspect equipment to manufacturer's standards
    • • Inspection documentation from an independent third party
    • • Frees your personnel from the responsibility of equipment inspections

This service will include a “sight and touch” functional inspection of hardware, nylon products (including rope, webbing, and anchoring components), harnesses, and accessory equipment (including litters and stretchers) utilized in confined space/high angle applications. The inspection will be conducted in accordance with manufacturer’s specifications and will satisfy the requirement for an annual1 inspection by a competent person.

Annual Equipment Inspections for Rescue TeamsReporting documentation will include pertinent information such as the manufacturer, product number, and serial/lot number (where applicable), date of manufacture, and in-service date (when available). It will also include the results of pass/fail testing for both visual and functional inspection. All equipment deemed unsuitable for use will be tagged for removal from service. 

A full report of findings will be provided to include storage conditions, accessibility of equipment to responders, and any other recommendations to improve overall team performance. 

Annual Equipment Inspections for Rescue TeamsRescue team members are encouraged to attend this inspection where they will receive information on proper pre- and post-use inspections for their equipment. Guidance can be also offered in areas of equipment care, inspection, record-keeping, and proper storage. Please note that equipment recommendations will NOT be provided unless requested to do so.

For more information or to schedule dates, call us at 800-647-7626 or email info@RocoRescue.com.


References include: 1926.502 Appendix C; ANSI Z359.2 Section 5.5.2 Inspections; ASTM Rope Inspection Guide; NFPA 1983 Section 5.2; ANSI Z359.11 Annex A (harnesses); and ANSI Z359.4 Section 6.1.

NOTICE: The client remains responsible for ensuring that all guidelines and requirements for maintaining and, where indicated, removal of equipment from service, are followed. This includes removing equipment from service anytime there is a situation or incident that occurs during handling, training, or rescue, that might have caused damage or otherwise compromised the integrity of the equipment, particularly where internal damage that is not visible might be present (e.g. equipment dropped from height, exposure of nylon products to chemicals or other potentially degrading substances, etc.). Client will be required to complete a certification that between Roco inspections, the equipment was properly stored, was available only to personnel trained to use the equipment properly, and that any equipment that was exposed to any condition or occurrence that could have resulted in hidden damage has been removed from service. A company representative, preferably someone from the rescue team, must be present during the inspection process.
 
 

OSHA Memorandum on Confined Spaces in Construction

Sunday, September 13, 2015

OSHA Memorandum on Confined Spaces in ConstructionThis memorandum provides guidance on the enforcement of the Confined Spaces in Construction standard published on May 4, 2015. The new standard goes into effect on August 3, 2015. Requests for an extension of the effective date have indicated a need for additional time for training and the acquisition of equipment necessary to comply with the new standard. OSHA will not delay the effective date, but instead will postpone full enforcement of the new standard for 60 days from the effective date of August 3, 2015 to October 2, 2015.

During this 60-day period, OSHA will not issue citations to an employer making good faith efforts to comply with the new standard, as long as the employer is in compliance with either the training requirements of the new standard, found at 29 CFR 1926.1207, or the training requirements found at former 29 CFR 1926.21(b)(6)(i), which is provided:

All employees required to enter into confined or enclosed spaces shall be instructed as to the nature of the hazards involved, the necessary precautions to be taken, and in the use of protective and emergency equipment required. The employer shall comply with any specific regulations that apply to work in dangerous or potentially dangerous areas.

Employers who fail to train their employees consistent with either 29 CFR 1926.1207 or 1926.21(b)(6)(i) would properly be cited for violation of 1926.1207(a). Factors OSHA will consider when evaluating whether an employer is engaged in good faith efforts to comply with the new standard include:

  • If the employer has not trained its employees as required under the new standard, whether the employer has scheduled such training,
  • If the employer does not have the equipment required for compliance with the new standard, including personal protective equipment, whether the employer has ordered or otherwise arranged to obtain such equipment required for compliance and is taking alternative measures to protect employees from confined space hazards, and
  • Whether the employer has engaged in any additional efforts to educate workers about confined space hazards and protect workers from those hazards.
 

Roco QUICK DRILL #8 - Petzl ID

Thursday, August 27, 2015
Roco QUICK DRILL #8 - Petzl ID

Maintain Proficiency with Ground Station Drills

The Petzl ID is a great device. However, as with any device or technique, if you don’t practice, you risk forgetting some of the basic principles and functions involved in its proper use. Using quick and easy-to-set-up ground stations will help to keep proficiency levels up while reducing risk, logistics, and time required.

Here are some drills and ground station ideas that will help the Petzl ID operator stay proficient. Keep in mind, these hands-on ground stations can often be applied to other devices and techniques as well – not every training session requires suspending rescuers!

Station Set-Up

Choose a solid anchor at ground level with about 10 feet of space to move and pull rope. This can be done in a classroom, apparatus bay or other area since the drill is about proficiency in using the ID and its different functions.

Taking-in Slack “TENSION”

Have the participant load and anchor the device as a lower. Pull at least 5-to-10 feet of slack out of the device and have participant pull the slack out of the system through the device as if setting a plumb point.

Have the operator stand in front of the ID, facing the anchor. Hold the two ends of the rope in front of the device and close together. This will prevent the safety cam from grabbing the rope while the participant strips rope on the standing end of the device (the 11 O’clock) to take-in (tension) slack.

Remember, taking in slack (tensioning) is also important when starting a Z-rig haul as the system may not automatically start stripping/cleaning the rope through the device if it should be locked. In this case, the load would not be captured and any progress gained would be lost or dropped if the haul team let go of the haul line. This may also occur initially with a 5:1 Z-rig, even if the device is unlocked, until the full load is on the system.

Giving-out Slack “SLACK”

To give out (or feed) slack, have the operator remain in the descent control position (behind the device). Keeping the device with the top or bottom plates facing the ground, simply use the left hand to turn the body of the ID perpendicular to the direction of the load travel as rope is pulled with the right hand from the 7 O’clock position of the ID. Simulate adjusting a plumb point or feeding slack once a lower is complete and the patient is on the ground.

Rappel Ground Exercise

Have participants anchor the rope for a rappel and attach the ID to the rope and their harnesses. Have them lean away from the anchor and walk backwards while using the device to control speed. Review hand and body positions and have operators pull the ID into panic mode and reset. Direct participants to let go of the rope in order to build confidence in the automatic braking of the device. Also, have them practice tensioning and feeding slack (adjusting rappel plumb point) while in the rappel mode.

This drill may seem too simple to be of any benefit, but how many of us have watched our teammate fumble with loading, or fumble while trying to adjust the tension or give slack on an anchored ID? The more hands-on time operating this device, the better! Practicing a technique at ground level will help rescuers be more proficient when they “live load” a system during training, or when performing a real rescue.

The Petzl ID Video

Review the features of the popular rescue tool with Roco Chief Dennis O'Connell.

 

Next in this series: QUICK DRILL #9 - Belay Systems

QuickDrill-09

 

Six Egregious Violations filed by OSHA for Houston Trench Incident

Tuesday, August 4, 2015

Six Egregious Violations filed by OSHA for Houston Trench IncidentOne minute a worker was working in the 8-foot trench below ground. The next, he was being buried in it. His co-workers came to his rescue, digging him out with their bare hands. Moments after they pulled the injured man to safety, the unprotected trench collapsed again. His injuries were serious and led to his hospitalization.

What’s more, the man's Houston-area employer knew the Richmond, Texas, excavation site was dangerous, but failed to protect its workers.

OSHA has since cited the company for 16 safety violations, including six egregious willful violations for failing to protect workers inside an excavation from a cave-in. The company faces penalties totaling $423,900.

"For more than 2,500 years, man has known how to prevent deadly trench collapses. It is absolutely unacceptable that employers continue to endanger the lives of workers in trenches," said Assistant Secretary of Labor for Occupational Safety and Health Dr. David Michaels. In addition to the willful violations, the company was cited for nine serious violations, including failing to remove debris from the edge of the excavation. The company also did not provide a safe means to get in and out of the excavation for workers or conduct atmospheric testing inside excavations after a sewer leak.

"Trench cave-ins are preventable," said John Hermanson, OSHA's regional administrator in Dallas. "There are long-established, basic precautions. They're not new, and they're not secret. This company knew its trenches weren't safe, but still put its workers in harm's way."

OSHA has also placed the company in its Severe Violator Enforcement Program. The program concentrates resources on inspecting employers who have demonstrated indifference towards creating a safe and healthy workplace by committing willful or repeated violations, and/or failing to abate known hazards. It also mandates follow-up inspections to ensure compliance with the law.

(Excerpts, photos and videos from a story by Safety News Alert)

RescueTalk™ (RocoRescue.com) has been created as a free resource for sharing insightful information, news, views and commentary for our students and others who are interested in technical rope rescue. Therefore, we make no representations as to accuracy, completeness, or suitability of any information and are not liable for any errors, omissions, or delays in this information or any losses, injuries, or damages arising from its display or use. All information is provided on an as-is basis. Users and readers are 100% responsible for their own actions in every situation. Information presented on this website in no way replaces proper training!